[1] Ernst, A.T., Jiang, H., Krishnamoorthy, M., and Sier, D., Staff scheduling and rostering: A review of applications, methods and models.
European Journal of Operational Research, 153 (2004), pp. 3–27.
[2] Glover, F., McMillan, C., The general employee scheduling problem: An integration of management science and artificial intelligence.
Computers & Operations Research, 13 (1986), pp. 563–593.
[5] Guastello, S.J., Human factors engineering and ergonomics: a systems approach, Mahwah, NJ: Lawrence Erlbaum Associates, Publishers, (2006).
[6] Niebel, B.W., Motion and time study: an introduction to methods, time study, and wage payment, RICHARD D. IRWIN, INC, HOMEWOOD, ILLINOIS, (1958).
[7] Ku, C.H., Smith, M.J., Organizational factors and scheduling in locomotive engineers and conductors: Effects on fatigue, health and social well-being.
Applied Ergonomics, 41 1 (2010), pp.62–71.
[8] ROSA, R.R., Extended work shifts and excessive fatigue. Journal of Sleep Research, 4 (1995), pp. 51-56.
[9] Eiselt, H.A., Marianov, V., Employee positioning and workload allocation. Computers & Operations Research, 35 (2008), pp. 513–524.
[10] Akbari, M., Zandieh, M., Dorri, B., Scheduling part-time and mixed-skilled workers to maximize employee satisfaction. The International Journal of Advanced Manufacturing Technology, 64 5-8 (2013), pp. 1017-1027
[11] Florence, P.S., Economics of fatigue and unrest and the efficiency of labour in English and American industry, Cornell University, New York: H. Holt and Co., (2003)
[14] Alfares, H.K., Survey, Categorization, and Comparison of Recent Tour Scheduling Literature.
Annals of Operations Research, 127 1-4 (2004), pp. 145–175.
[15] Avramidis, A.N., Chan, W., Gendreau, M., L’Ecuyer, P., Pisacane, O., Optimizing daily agent scheduling in a multiskill call center, European Journal of Operational Research 200 (2010) 822–832.
[16] Bhulai, S., Koole, G., Pot, A., Simple methods for shift scheduling in Multiskill call centers, Manufacturing & Service Operations Management 10 (2008) 411–420.
[17] Topaloglu, S., Ozkarahan, I., An Implicit Goal Programming Model for the Tour Scheduling Problem Considering the Employee Work Preferences.
Annals of Operations Research, 128 1-4 (2004), pp. 135–158.
[19] Bechtold, S.E., Jacobs, L.W., Implicit modeling of flexible break assignments in optimal shift scheduling.
Management Science, 36 11 (1990), pp. 1339–1351.
[20] Thompson, G.M., Improved Implicit Optimal Modeling of the Labor Shift Scheduling Problem.
Management Science, 41 4 (1995), pp. 595-607.
[21] Jacobs, L.W., Brusco, M.J., Overlapping start-time bands in implicit tour scheduling.
Management Science, 42 9 (1996), pp. 1247–1259.
[22] Brusco, M.J., Jacobs, L.W., Personnel tour scheduling when starting-time restriction are present.
Management Science, 44 4 (1998), pp. 534–547.
[23] Stolletz, R., Operational workforce planning for check-in counters at airports. Transportation Research Part E – Logistics and Transportation Review 46 (2010), pp. 414–425.
[24] Stolletz, R., Brunner, J.O., Fair optimization of fortnightly physician schedules with flexible shifts. European Journal of Operational Research, 219 (2012), pp. 622–629
[25] Stolletz, R., Zamorano, E., A rolling planning horizon heuristic for scheduling agents with different qualifications. Transportation Research Part E, 68 (2014), pp. 39–52.
[26] Brunner, J.O.,
Bard, J.F., Flexible weekly tour scheduling for postal service workers using a branch and price. Journal of Scheduling, 16 (2013), pp. 129-149.
[27] Jarrah, A.I.Z., Bard, J.F., deSilva, A.H., Solving large-scale tour scheduling problems.
Management Science, 40 9 (1994), pp. 1124–1144.
[28] Brusco, M.J., Solving personnel tour scheduling problems using the dual all-integer cutting plane.
IIE Transactions, 30 9 (1998), pp. 835_844.
[29] Rekik, M., Cordeau, J.F., Soumis, F., Using Benders Decomposition to Implicitly Model Tour Scheduling.
Annals of Operations Research, 128 1-4 (2004), pp.111–133.
[30] Zolfaghari, S., Vinh, Q., El-Bouri, A., Khashayardoust, M., Application of a genetic algorithm to staff scheduling in retail sector, International Journal of Industrial and Systems Engineering, 5 (2010) 20–47.
[31] Baker, K., Scheduling a Full-Time Workforce to Meet Cyclic Staffing Requirements.
Management Science, 20 12 (1974), pp. 1561–1568.
[34] Loucks, J.S., Jacobs, F.R., Tour Scheduling and Task Assignment of a Heterogeneous Work Force: A Heuristic Approach.
Decision Sciences, 22 4 (2007), pp. 719 – 738.
[35] Van den Bergh, J., Beliën, J., De Bruecker, P., Demeulemeester, E., De Boeck, L., Personnel scheduling: A literature review. European Journal of Operational Research, 22 6 (2013), pp. 367–385.
[36] Easton, F.F., Rossin, D.F., Sufficient working subsets for the tour scheduling problem. Management Science, 37 11 (1991), pp. 1441-1451.
[37] Li, C., Robinson, E.P., Mabert, V.A., An Evaluation of Tour Scheduling Heuristics with Differences in Employee Productivity and Cost.
Decision Sciences, 22 4 (1991), pp. 700–718.
[38] Brusco, M.J., Johns, T.R., Staffing a Multi-skilled Workforce with Varying Levels of Productivity: An Analysis of Cross-training Policies.
Decision Sciences, 29 2 (1998), pp. 499–515.