[1] Radakryshnan, R., Balasubramanian, S; Translated by Adel Azar and Saeed Jahanian (2010). "Business Process Reengineering : Text and Cases ", Tehran, SAMT, Research and Development Center for Humanities
[2] Zarei, B., Farkish, S, (2004). "Study experiences of Reengineering in Iran ", 4th International Industrial Engineering Conference. Tehran: sivilica, Vol.4, pp. 1-13.
[3] Sori, H. (2005)." Reengineering of Iranian organizations ", Tehran: RASA
[4] Natarajan, M. (2009). Exploring the Business Process Re-Engineering: National Science Library’s Experience. Communications of the IIMA: Vol. 9: Iss. 4, Article 7.
[5] Bayati, A. (2013)." Managing Change in Organizations: A Practice Guide "/ International Project Management Association, Ariana ghalam.
[6] Abdolvand, N., Albadvi, A. and Ferdowsi ,Z. (2008). Assessing readiness for business process reengineering. Business Process Management Journal, Vol. 14 No. 4, pp. 497-511.
[7] Shahbandarzadeh, H., Saeedi, F. (2011). " Identify and determine the importance of factors organizational readiness for implementing process re-engineering using a Hybrid approach DEMATEL and analysis network process With fuzzy approach (FANP)", Journal of Operational Research in Its Applications, Vol. 10. No. 1, pp. 1-17.
[8] Parvin,B., Salvati, A. (2014). A Study on Keshavarzi Bank Readiness for Process Re-Engineering (Case Study: Kurdistan Province). Journal of American Science;10(2s). Pp.43-49.
[9] Mlay, S. V., Zlotnikova, I., Watundu, S. (2013). A Quantitative Analysis of Business Process Reengineering and Organizational Resistance: The Case of Uganda. The African Journal of Information Systems, Vol. 5 . Issue 1. Pp. 1-29.
[10] Hussain, M., Saleh, M., Akbar, S., Jan, Z. (2014). Factors Affecting Readiness for Business Process Reengineering-Developing and Proposing a Conceptual Model. European Journal of Business and Management , Vol.6, No.1.
[11] Habib, M. N. (2013). Understanding Critical Success and Failure Factors of Business Process Reengineering. International Review of Management and Business Research, Vol. 2 .Issue.1. Pp. 1-10.
[12] Shahbandarzadeh, H., Salimifard, Kh., Saeedi, F. (December, 2012). Developing a Framework to Identify the Factors Affecting the Measurement of Organization Readiness for Business Process Reengineering Implementation an Exploratory Factor Analysis Method. (EFA). International Academic Research Journal of Business and Management , Vol No.1, Issue No.6, Page no.1-16.
[13] Salimifard, Kh., Abbaszadeh, M.A., Ghorbanpur, A. (July, 2010). Interpretive Structural Modeling of Critical Success Factors in Banking Process Re-engineering. International Review of Business Research Papers Vol. 6. No 2. Pp.95-103.
[14] Sturdy, G. R. (2010). Business process reengineering: strategies for occupational health and safety. Cambridge Scholars Publishing.
[15] Aghdasi, M., Albadvi, A. and Ostadi, B. (2010), 'Desired organisational capabilities (DOCs): mapping in BPR context', International Journal of Production Research, 48: 7, 2029 - 2053.
[16] Cheng, T. C. E., Chiu, Ida S. F. (2008). Critical Success Factors of Business Process Re-engineering in the Banking Industry. Knowledge and Process Management, Volume 15, Number 4 pp 258–269.
[17] Paper, D. Chang, R.D. (January, 2005). The State of Business Process Reengineering: A Search for Success Factors. Total Quality Management, Vol. 16, No. 1, 121–133.
[18] Ghouchani, farokh, Zamani, Faezeh. (2011). the Competency of Re- Engineering in Improvements of Competitive Strategies. Journal of Strategic Management Studies-JSMS, Vol. 6, No. 2, 103–117.
[19] Sung.T.K, Gibson.D.V, (1998), Critical Success factors for business reengineering and corporate performance: the case of Korean corporations, Technological Forcasting and Social Change,58,pp 297-311.
[20] Al-Mashari, M., Zairi, M. (1999). BPR implementation process: an analysis of key success and failure factors. Business Process Management Journal, Vol. 5 No. 1, 1999, pp. 87-112.
[21] Rezaee. K, Tadayon, S. Ostadi, B. Aghdasi, Mohamd (2009). Critical success factors in the implementation process management and provide a framework for assessing organizational readiness. Journal Industrial Management, Vol. 1 No. 3, pp. 37-52.
[22] Alibabaee, A. Aghdasi, M. Zaree, B. (2010). Study of factors success and failure and aspects them in projects business process re-engineering in iran through the use of Comprehensive framework. Journal Management information technology. Vol. 5 No. 2, pp. 91-110.
[23] Haghighat, F., Mohammadi, M. (January, 2012). Designing the Model of Effective Factors on Acceptance of BusinessProcess Reengineering(BPR), Case study: Isfahan Municipality. Interdisciplinary Journal of Contemporary research in business, Institute of Interdisciplinary Business ResearchT, Vol. 3, No 9, pp. 281-289.
[24] Naz, A., Azhar, Z., Nawaz, M., Gul, A. (2013). Role of Human Resources Management in the Effectiveness of Business Process Reengineering. Journal of Resources Development and Management- An Open Access International Journal, Vol.1, pp. 60-64.
[25] Ostadi, B. Aghdasi, M. Albadavi, A. Rezaee, K. (2010). Explaining the relationship and Interactions Between stage Business process reengineering, BPM and quality management systems (QMS) by use of concepts RBVF model and Dynamic Capabilities. Journal of Industrial Engineering. Vol. 2: Iss. 44, Article 7.pp. 117-125.
[26] Natarajan, M. (2009) "Exploring the Business Process Re-Engineering: National Science Library’s Experience , " Communications of the IIMA: Vol. 9: Iss. 4, Article 7.
[27] Jafari, M., Akhavan, P., Rezaee noor, J .(2009). Explained Critical success factors in Business Process Reengineering: Case Study One of the companies related to defense Industries, Journal of Management researches in Iran: Vol. 13: Iss. 2, pp. 23-64.
[28] Mirzaee ahanjani, H. (2012). "Detailed plan extension a new horizon in identifying and pathology public organizations and the government Iranian (west regional water) ". Applied Research Center of Tehran University School of Management.
[29] Dehghan, R., Talebi, K., Arabioun, A. (2011). "Organizational Entrepreneurship and Innovation at Medical Sciences Universities of Iran ", Journal of Payavard salamat, VOL. 6, NO. 1, pp. 22-33.
[30] Jafari, M., Akhavan P., Rezaee noor, J. (2008) " Explanation Critical Success Factors at Process re-engineering Case Study One of the companies belonging to defense industries ", Journal of Management Research in Iran , Vol. 13, No. 2, pp. 23-64.
[31] Mansoryan, F, & Fatehrad, M. (2012). "Macro analysis of entrepreneurial university in the framework of the tripartite ramifications model and investigate the success factors of this university", Rahyaft, N. 54,
[32] Momeni, M., &Faal ghayomi, A. "Statistical analysis by using Spss", Moalef, Tehran, 2015, pp 187-190.
[34] Mahmodi, J., Badaghi Gh. (2011) "Re-engineering processes with simulation approach Case study: National company refining and distribution of iranian petroleum products ", Journal of Management Research in Iran, Vol. 16, No. 4, pp. 23-64.