[1] Paulraj, M. S., Nuzhat, S., & Hussain, C. M. (2021). Source reduction and waste minimization. Elsevier: Amsterdam, The Netherlands,
[2] Dixit, S., Mandal, S. N., Thanikal, J. V., & Saurabh, K. (2018). Construction productivity and construction project performance in Indian construction projects. In M. J. Skibniewski & M. Hajdu (Eds.), Proceedings of the Creative Construction Conference, 379ـ386. Ljubljana, Slovenia: Diamond Congress Ltd. https://doi.org/10.3311/CCC2018-050
[3] Fulford, R., & Standing, C. (2014). Construction industry productivity and the potential for collaborative practice. International journal of project management, 32(2), 315ـ326. https://doi.org/10.1016/j.ijproman.2013.05.007
[4] Mahamid, I. (2013). Contractor’s perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20(5), 446ـ460. https://doi.org/10.1108/ECAM-08-2011-0074
[5] Princy, J. D., & Shanmugapriya, S. (2017). A probabilistic fuzzy logic approach to identify productivity factors in Indian construction projects. Journal of Construction Engineering and Project Management, 7(3), 39ـ55. https://doi.org/10.6106/JCEPM.2017.9.29.039
[6] Alaloul, W. S., Alzubi, K. M., Malkawi, A. B., Al Salaheen, M., & Musarat, M. A. (2022). Productivity monitoring in building construction projects: a systematic review. Engineering, Construction and Architectural Management, 29(7), 2760ـ2785. https://doi.org/10.1108/ECAM-03-2021-0211
[7] Lim, E. C., & Alum, J. (1995). Construction productivity: issues encountered by contractors in Singapore. International journal of project management, 13(1), 51ـ58. https://doi.org/10.1016/0263-7863(95)95704-H
[8] Zakeri, M., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1996). A survey of constraints on Iranian construction operatives’ productivity. Construction Management and Economics, 14(5), 417–426. https://doi.org/10.1080/014461996373287
[9] Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors influencing craftsmen's productivity in Indonesia. International journal of project management, 15(1), 21ـ30. https://doi.org/10.1016/S0263-7863(96)00019-1
[10] Alwi, S. (2003). Factors influencing construction productivity in the Indonesian context. Proceedings of the 5th Eastern Asia Society for Transportation Studies; 29 October-1 November, Fukuoka, Japan; 1557-1571. https://eprints.qut.edu.au/4237
[11] Faridi, A. S., & El‐Sayegh, S. M. (2006). Significant factors causing delay in the UAE construction industry. Construction management and economics, 24(11), 1167ـ1176. https://doi.org/10.1080/01446190600827033
[12] Doloi, H. (2008). Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), 841ـ854. https://doi.org/10.1080/01446190802244789
[13] Dai, J., Goodrum, P. M., Maloney, W. F., & Srinivasan, C. (2009). Latent structures of the factors affecting construction labor productivity. Journal of construction engineering and management, 135(5), 397ـ406. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:5(397)
[14] ElـGohary, K. M., & Aziz, R. F. (2014). Factors influencing construction labor productivity in Egypt. Journal of management in engineering, 30(1), 1ـ9. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000168
[15] Hwang, B. G., Zhu, L., & Ming, J. T. T. (2017). Factors affecting productivity in green building construction projects: The case of Singapore. Journal of Management in Engineering, 33(3), 04016052. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000499
[16] Hasan, A., Baroudi, B., Elmualim, A., & Rameezdeen, R. (2018). Factors affecting construction productivity: a 30 year systematic review. Engineering, construction and architectural management, 25(7), 916-937. https://doi.org/10.1108/ECAM-02-2017-0035
[17] Dixit, S. (2021). Impact of management practices on construction productivity in Indian building construction projects: An empirical study. Organization, technology & management in construction: an international journal, 13(1), 2383ـ2390. https://doi.org/10.2478/otmcj-2021-0007
[18] Awaad, S., Mahdi, I., Mahmoud, D., & Abdelrashid, I. (2022). Factors affecting the productivity of road construction projects in Egypt. International Journal of Research in Engineering & Management, 5(2), 48-53.
[19] Mahat, N. A. A., Adnan, H., & Yusuwan, N. M. (2021). Analysing Factors Affecting Green Construction Productivity: Exploratory Factor Analysis. International Journal of Sustainable Construction Engineering and Technology, 12(5), 197-204. https://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/9970
[20] Suhail, S. A. (1993). Outـofـlogic progress. Cost Engineering, 35(4), 23.
[21] Waagner, R. (2012). Handling outـofـsequence progress. Rockville, MD: Warner Consultants.
[22] Abotaleb, I. S., ElـAdaway, I. H., Ibrahim, M. W., Hanna, A. S., & Russell, J. S. (2020). Developing a rating score for outـofـsequence construction. Journal of Management in Engineering, 36(3), 04020013. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000765
[23] Lee, J. S. (2016). Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11), 04016064. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001184
[24] Abotaleb, I. S., & Elـadaway, I. H. (2018). Managing construction projects through dynamic modeling: Reviewing the existing body of knowledge and deriving future research directions. Journal of management in engineering, 34(6), 04018033. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000633
[25] Ibrahim, M. W., Hanna, A. S., Russell, J. S., Abotaleb, I. S., & ElـAdaway, I. H. (2020). Quantitative analysis of the impacts of outـofـsequence work on project performance. Journal of Construction Engineering and Management, 146(8), 04020090. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001876
[26] Abotaleb, I. S., Elـadaway, I. H., Ibrahim, M. W., Hanna, A. S., & Russell, J. S. (2019). Causes, early warning signs, and impacts of outـofـsequence construction: Expertـbased survey analysis. Journal of Management in Engineering, 35(6), 04019030. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000724
[27] Ye, G., Jin, Z., Xia, B., & Skitmore, M. (2015). Analyzing causes for reworks in construction projects in China. Journal of management in engineering, 31(6), 04014097. https://doi.org/10.1061/(ASCE)ME.1943-5479.000034
[28] Al Saeedi, A. S., & Karim, A. M. (2020). Analyzing the Performance of Mega Construction Projects in Oman: A Study of Selected Projects from Oil & Gas Sector. American International Journal of Business and Management Studies, 2(2), 52-72. https://doi.org/10.46545/aijbms.v2i2.247
[29] Mahamid, I. (2020). Study of relationship between rework and labor productivity in Building Construction Projects. Revista de la construcción, 19(1), 30-40. http://dx.doi.org/10.7764/rdlc.19.1.30-41
[30] Akal, A. Y. (2024). Determining the Stationary Cause of Construction Delay in Highway Projects. Journal of Integrated Engineering and Technology, 1(1), 18-39. https://dx.doi.org/10.21608/jiet.2024.293937.1012
[31] Gumusburun Ayalp, G., & Arslan, F. (2025). Modeling Critical Rework Factors in the Construction Industry: Insights and Solutions. Buildings, 15(4), 606. https://doi.org/10.3390/buildings15040606
[32] Abotaleb, I. S., & Elـadaway, I. H. (2018). First attempt toward a holistic understanding of the interdependent rippled impacts associated with outـofـsequence work in construction projects: System dynamics modeling approach. Journal of Construction Engineering and Management, 144(9), 04018084. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001539
[33] Ibbs, W., Berry, M., & Sun, X. (2017). Visualizing skipped and outـofـsequence work. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(4), 05017006. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000240
[34] Williams, T., Klakegg, O., Andersen, B., Walker, D., Magnussen, O., & Onsoyen, L. (2010). Early warning signs in complex projects. In Proceedings of the PMI Research and Education Conference (pp. 1-28). Project Management Institute.
[35] Nikander, I. O. (2002). Early warnings: A phenomenon in project management. Dissertation for Doctor of Science in Technology. Espoo, Finland: Helsinki University of Technology.
[36] Ansoff, H. I. (1975). Managing strategic surprise by response to weak signals. California management review, 18(2), 21-33. https://doi.org/10.2307/41164635
[37] Larsen, A. S. A., Karlsen, A. T., Lund, J. Å., & Andersen, B. S. (2022). Assessment of early warning signs in hospital projects' frontـend phase. International Journal of Managing Projects in Business, 15(2), 299ـ323. https://doi.org/10.1108/IJMPB-06-2021-0156
[38] Liu, Z. M., & Xie, K. F. (2013, June). Research on the Early-Warning for Construction Project Cost Risk. In 2013 Fourth International Conference on Digital Manufacturing & Automation (pp. 1127-1129). IEEE. https://doi.org/10.1109/ICDMA.2013.265
[39] Peng, J. (2016, October). Study on safety risk warning index for highway construction project. In 2016 5th International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2016) (pp. 934-938). Atlantis Press. https://doi.org/10.2991/iccahe-16.2016.145
[40] Shokouhi, M. R., Beheshti, M., Fatahi, K., & Rahmati, A. (2018). Identifying Early Warnings in Drilling Projects and Finding their Relationships to the Outcomes and Problems of these Projects in Some Real Cases in Iran. Petroleum Business Review, 2(2), 60-67. https://doi.org/10.22050/pbr.2018.91321
[41] Giri, M., Zhang, C., Olorunnishola, A., Hada, S., & Pal, U. K. (2025). Developing a Construction Delay Prediction Model as a Delay-Avoidance Strategy for Public Construction Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 17(3), 04525027. https://doi.org/10.1061/JLADAH.LADR-1276
[42] Shafaat, A., Marbouti, F., & Mahfouz, T. (2023). Early warning system for highway construction projects using GA-SVM. International Journal of Construction Management, 23(14), 2348-2357. https://doi.org/10.1080/15623599.2022.2056805
[43] Li, G., Ran, R., Fang, J., Peng, H., & Wang, S. (2021). Early Warning for the Construction Safety Risk of Bridge Projects Using a RS‐SSA‐LSSVM Model. Advances in Civil Engineering, 2021(1), 4449451. https://doi.org/10.1155/2021/4449451
[44] Zhang, L., Wang, J., Wu, H., Wu, M., Guo, J., & Wang, S. (2022). Early warning of the construction safety risk of a subway station based on the LSSVM optimized by QPSO. Applied Sciences, 12(11), 5712. https://doi.org/10.3390/app12115712
[45] Mahdiyar, A., Mohandes, S. R., Durdyev, S., Tabatabaee, S., & Ismail, S. (2020). Barriers to green roof installation: An integrated fuzzy ـ based MCDM approach. Journal of Cleaner Production, 269, 122-365. https://doi.org/10.1016/j.jclepro.2020.122365
[46] Wey, W. M. (2019). Constructing urban dynamic transportation planning strategies for improving quality of life and urban sustainability under emerging growth management principles. Sustainable Cities and Society, 44, 275-290. https://doi.org/10.1016/j.scs.2018.10.015
[47] Ecer, F., & Pamucar, D. (2020). Sustainable supplier selection: A novel integrated fuzzy best worst method (F ـ BWM) and fuzzy CoCoSo with Bonferroni (CoCoSo'B) multi ـ criteria model. Journal of Cleaner Production, 121981. https://doi.org/10.1016/j.jclepro.2020.121981
[48] Rejeb, A., Rejeb, K., Keogh, J.G., & Zailani, S. (2022). Barriers to blockchain adoption in the circular economy: a fuzzy delphi and best-worst approach. Sustainability, 14(6), 3611. https://doi.org/10.3390/su14063611
[49] Robert, C. (2007). The Bayesian choice: from decision-theoretic foundations to computational implementation. NY: Springer Science & Business Media.
[50] Berger, J. (2013). Statistical decision theory: foundations, concepts, and methods. Springer Science & Business Media.
[51] LaValle, S. M. (2006). Planning Algorithms, Cambridge University Press.
[52] McKenna, C. K. (1980). Quantitative Methods for Public Decision Making. United Kingdom: McGrawـHill.
[53] Klakegg, O. J., Williams, T., & Shiferaw, A. T. (2016). Taming the ‘trolls’: Major public projects in the making. International Journal of Project Management, 34(2), 282-296. https://doi.org/10.1016/j.ijproman.2015.03.008
[54] Nikander, I. O., & Eloranta, E. (2001). Project management by early warnings. International journal of project management, 19(7), 385-399. https://doi.org/10.1016/S0263-7863(00)00021-1
[55] Lee, S., Tae, S., Jee, N., & Shin, S. (2015). LDA-based model for measuring impact of change orders in apartment projects and its application for prerisk assessment and postevaluation. Journal of Construction Engineering and Management, 141(7), 04015011. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000971
[56] Liu, J., Xie, Q., Xia, B., & Bridge, A. J. (2017). Impact of design risk on the performance of design-build projects. Journal of Construction Engineering and Management, 143(6), 04017010. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001299
[57] Son, J., & Rojas, E. M. (2011). Impact of optimism bias regarding organizational dynamics on project planning and control. Journal of construction engineering and management, 137(2), 147-157. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000260
[58] Babar, S., Thaheem, M. J., & Ayub, B. (2017). Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3), 04016104. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001245
[59] Ibrahim, M. W. W. (2018). Improving project performance by mitigating out-of-sequence work and assessing construction readiness. The University of Wisconsin-Madison. https://www.proquest.com/openview/effad3a63655de30e571265cc1e02e7b/1?pq-origsite=gscholar&cbl=18750