Calculation of Derivations from every objective of the project is very ‎important for both contractors and employers. Time overrun is the function ‎of all project risks. A tool that can assess the risk levels and estimate the ‎derivations from the planed duration is very useful for contractors. This ‎research tries to propose a new methodology to determine the schedule risk ‎of construction projects and the total time overrun. This methodology uses ‎influence diagram to construct the risk model and fuzzy risk assessment ‎system to estimate time overrun for every activity. Then the information of ‎fuzzy risk assessment model is used by scheduling the softwares such as ‎MSP or Primavera to calculate the time overrun of the project. This model ‎has been used in one of the track renewal projects of Iran Railway ‎Administration. ‎
The model was validated by using the estimated data produced by model and ‎the real data of the activities’ duration. Then the mean absolute percentage ‎error (MAPE) was calculated for the activities and the project. MAPE of the ‎activities was equal to 10.75% and the estimated duration of project was ‎equal to 105.24 time unit. In comparison with the real duration of project ‎‎(which was equal to 113 time units and MAPE for the whole project was ‎equal to 6.7%), it can be concluded that fuzzy risk assessment model has ‎remarkable accuracy to be used in construction projects.‎

Keywords