Volume 27 (2023)
Volume 26 (2022)
Volume 25 (2021)
Volume 24 (2020)
Volume 23 (2019)
Volume 22 (2018)
Volume 21 (2017)
Volume 20 (2016)
Volume 19 (2015)
Volume 18 (2014)
Volume 17 (2014)
Volume 16 (2012)
Volume 15 (2011)
Volume 14 (2010)
Volume 13 (2010)
Volume 12 (2009)
Volume 11 (2007)
Volume 10 (2006)
Volume 9 (2005)
Volume 8 (2004)
Volume 7 (2003)
Volume 6 (2002)
Volume 5 (2001)
Selecting project manager based on competency model using SWARA and WASPAS combined methods: Case of Pishgaman Kavir Yazd Cycas Park Project

Jalil Heydari Dehooei; Seyyed Jalaladdin Hosseini Dehshiri

Volume 22, Issue 4 , February 2019, , Pages 47-72

Abstract
  Construction projects are one of the most complex types of projects due to unpredictability process, operation and resource constraints. This leads to crucial role of project manager for the success of construction projects. Therefore, construction manager’s project selection is a significant issue. ...  Read More

Business Processes Design of Small and Medium Enterprises of Perishable Items in order to Determination of Optimum Production Policy with Simulation Approach

Jalil Heidary Dahooie; Seyed Mojtaba Sajadi; Fereshteh Tavan

Volume 19, Issue 3 , September 2015, , Pages 7-35

Abstract
  In today's competitive world, production and inventory control in small and medium enterprises (SME) is considered as an important issue by managers, because of the influence of factors such as fluctuations in demand and failure of machines. Network Failure Prone Manufacture Systems (NFPMs) are type ...  Read More